Connecting the power port to the LPR Processing Unit - SharpX X1S, X2S, X1S-CN, X2S-CN, XSU

AutoVu Hardware Guide for SharpX Mobile Installation

Applies to
SharpX X1S, X2S, X1S-CN, X2S-CN, XSU
Last updated
2018-10-05
Content type
Guides
Guides > Installation guides
Language
English (United States)
Product
SharpX

To power the SharpX cameras, you must connect the power port to the LPR Processing Unit.

What you should know

As a best practice, use a red wire for power (+) and a black wire for ground (GND) to be consistent with similar Genetec installations.

Procedure

  1. Plug the 3-pole connector into the power port, and then tighten the securing screws.
  2. Strip 10 mm (3/8 in.) of insulation from your stranded copper wires.
    Best Practice: For a more secure connection, crimp a ferrule to the tip of each stripped wire. Ensure that you use the appropriate ferrule for the wire gauge.
    WARNING: Do not lengthen any power or signal wires. If the wire you are installing is too short, replace with a new longer wire. Splices are a point of possible failure, causing the system to malfunction.
  3. Insert the wires into the connector poles.

    LPR Processing Unit power port

    • A: Permanent 12V (+). Use 14 AWG (red).
    • B: Negative/Return/GND. Use 14 AWG (black).
    • C: 12V Ignition (IGN). Use 20 AWG to 14 AWG (yellow). Include a 0.5A fuse (in-line or in the OEM fuse box using a tap fuse adapter).
    • D: Tension clamps
    • E: Securing screws

Example

Watch this video to learn more. Click the Captions icon (CC) to turn on video captions in one of the available languages. If using Internet Explorer, the video might not display. To fix this, open the Compatibility View Settings and clear Display intranet sites in Compatibility View.