Defining schedules with specific dates - Security Center 5.12

Security Center Administrator Guide 5.12

Product
Security Center
Content type
Guides > Administrator guides
Version
5.12
Language
English
Last updated
2024-09-13

To define a set of time constraints for situations that occur on specific dates, where each date can have a different time coverage, you can define schedules with specific dates and then apply them to entities.

What you should know

You can set a different time range for each date in the schedule.

Procedure

  1. Open the System task and click the Schedules view.
  2. Click Schedule (), type a name for the schedule, and press Enter.
  3. In the Identity tab, enter basic properties of the schedule, and then click Apply.
  4. Click the Properties tab.
  5. From the Date coverage list, select Specific, and then click Add an item ().
  6. Select dates on the calendar and click Close.
  7. Select an entry and, from the Time coverage list, do one of the following:
    • Select All day.
    • Select Range and then select specific times on the grid for the Day before, the Current day, or the Day after.
    • Select Daytime or Nighttime (see Defining twilight schedules for information on daytime and nighttime time coverages).
  8. Click Apply.

Example

The following example shows a specific schedule covering July 1, 2017 from 9:00pm the day before to 3:00am the day after.