Cloud Link Roadrunner LED status - Cloud Link Roadrunner

Cloud Link Roadrunner™ Hardware Installation Guide

Applies to
Cloud Link Roadrunner
Last updated
2023-08-02
Content type
Guides > Installation guides
Language
English
Product
Cloud Link Roadrunner™

The LEDs on the Cloud Link Roadrunner™ unit respond according to the status of the system.

Cloud Link Roadrunner LED status

LED State Description
Status () Orange Synergis™ Softwire has not started.
Green Synergis Softwire has started.
Blink slowly: Two green blinks per second The unit is connected to the Access Manager role.
Blink quickly: Five green blinks per second Firmware upgrade is in progress.
Power () Green The unit is receiving 22-26 Vdc.
Network () Green The unit is connected to the network.